Course Fees: $35,000
Course Code: CPC30220
Duration: 104 weeks
CRICOS: : 03569A
Course Overview
This is a trade qualification for carpenters in residential and commercial workplaces. It includes setting out, manufacturing, constructing, assembling, installing and repairing products made using timber and non-timber materials.
Entry Requirements
- Must be 18 years or above before commencement of study at Nomi College.
- Successful completion of Year 12, equivalent (Higher Secondary Certificate/ vocational higher secondary certificate (Minimum CGPA is 3.5 or 60% in HSC/First Division pass) GCE A-Level or higher qualification). Automotive mechanical Certificate III qualification
- Nomi College may also accept you in this course if you have any other relevant qualifications, certifications, and/or experience;
- A minimum overall score of 6 is required for candidates with IELTS with a minimum score of 5.5 in each band or a minimum PTE score of 52 is required
Tuition Fees
Certificate III in Carpentry – $35,000.00
Application fee- $350.00
Material fee- $2150
Core Unit
| CPCCWHS2001 | Apply WHS requirements, policies, and procedures in the construction industry |
| CPCWHS3001 | Identify construction work hazards and select risk control strategies |
| CPCCOM1012 | Work effectively and sustainably in the construction industry. |
| CPCCOM1014 | Conduct workplace communication |
| CPCCOM3001 | Perform construction calculations to determine |
| CPCCOM1015 | Carry out measurements and calculations |
| CPCCCA3025* | Read and interpret plans, specifications, and drawings for carpentry work |
| CPCCCA2011* | Handle carpentry materials |
| CPCCCM2006 | Apply basic levelling procedures |
| CPCCOM3006 | Carry out levelling operations |
| CPCCCA2002* | Use carpentry tools and equipment |
| CPCCCM2008* | Erect and dismantle restricted height scaffolding |
| CPCCCM2012* | Work safely at heights |
| CPCCCA3002* | Carry out setting out |
| CPCCCM2002* | Carry out hand excavation |
| CPCCCA3028* | Erect and dismantle formwork for footings and slabs on ground |
| CPCCSF2004* | Place and fix reinforcement materials |
| CPCCCO2013* | Carry out concreting to simple forms |
| CPCCCA3027* | Set up, operate and maintain indirect action powder-actuated power tools |
| CPCCCA3003* | Install flooring systems |
| CPCCCA3004* | Construct and erect wall frames |
| CPCCCA3005* | Construct ceiling frames |
| CPCCCA3006* | Erect proof trusses |
| CPCCCA3007* | Construct pitched roofs |
| CPCCCA3010* | Install windows and doors |
| CPCCCA3014* | Construct and install bulkheads |
| CPCCCA3008* | Construct eaves |
| CPCCCA3017* | Install exterior cladding |
| CPCCCA3024* | Install lining, paneling and moulding |
| CPCCCA3016* | Construct, assemble and install timber external stairs |
| CPCCCA3001* | Carry out general demolition of minor building structures carpentry material requirements |
Electives Unit
| CPCCOM1013 | Plan and organise work |
| CPCCCM3005 | Calculate costs of construction work |
| CPCCCM2002* | Carry out hand excavation |
| CPCCCA3027* | Set up, operate, and maintain indirect action powder-actuated power tools |
| CPCCSF2004* | Place and fix reinforcement materials |
| CPCCCA3014* | Construct and install bulkheads |
| CPCCCA3012* | Frame and fit wet area fixtures |
